PROJECTS
Client
Mid and South Essex NHS Foundation Trust
SECTOR: Healthcare |
Location
Southend-on-Sea, Essex
Completed
2024
Southend University Hospital – Linear Accelerator Facility
AD Architects were commissioned by Mid and South Essex NHS Foundation Trust to design a new facility for a Linear Accelerator (LINAC) at Southend University Hospital, extending the existing Radiotherapy department, thereby increasing radiotherapy capacity and improving patient care.
The new LINAC bunker was linked to an existing GP Streaming building, the refurbishment of which provided patient-facing and staff facilities and, together with the completed LINAC bunker, provided a fully compliant environment for state-of-the-art radiotherapy equipment, clinical spaces, control rooms, and support areas.
This highly complex project involved multiple technical requirements, with radiation shielding and plant infrastructure, while maintaining harmony with surrounding hospital buildings.
A new, clearly signposted entrance improved wayfinding and accessibility, with all patient areas step-free and fully compliant with accessibility standards.
Soft landscape spaces were limited on site, therefore the stair core was designed with perforated panel for climbing plants to create a green façade, improving the ambiance of the immediate surroundings and helping to create a more tranquil environment for patients.
* A Linear Accelerator (LINAC) is a sophisticated device that deliver precise beams of high-energy X-rays or electrons to destroy cancerous cells while minimising damage to surrounding healthy tissue.
© Copyright 2026 AD Architects
Web design by Union 10 Design