BIM CLOSE

Archive |

Winns Primary School

  • Winns Primary School

Client
London Borough Waltham Forest

SECTOR:
Archive |

Location
Walthamstow

BUDGET
£3m

A phased remodelling of an Edwardian school whilst in occupation. Refurbishment of all existing blocks and three new buildings to accommodate a library, a kitchen, administration and a main entrance.

The concept involved linking existing standalone buildings together with a new entrance, library and other blocks to allow internal circulation throughout.  The project was  completed in several phases to minimise disruption.

Posted in sector type|

View All projects

© Copyright 2017 AD Architects
Web design by Shaun Power Design