Bedford MRI 2

Bedford Hospital NHS Trust have appointed AD Architects with Galliford Try HPS to design a second MRI at Bedford Hospital.

AD Architects designed Bedford Hospital’s existing MRI Suite and is therefore looking forward to working with the Trust on this new scheme.

This project will likely be one of the last NHS P21+ schemes to be undertaken before the new P22 framework is introduced.

AD Architects is a P22 Primary Supply Chain Member.

 

 

 

Share this page: